Tamarah Engineering Consultations · Makkah

Building Permits in Makkah

We prepare your engineering file, submit it through the Balady platform, and follow it with the technical inspection company and the municipality until the permit is issued — in line with the Holy Capital Municipality and Royal Commission for Makkah City and Holy Sites requirements.

Balady

Fully electronic submission

Building Code

Technical review per the Saudi code

10 years

Mandatory hidden-defects insurance

Scope

What We Do for You

Reviewing the deed, survey decision, and plot requirements before we start

Preparing architectural and structural drawings per the Saudi Building Code

Accepting your authorization and submitting the request on Balady

Resolving technical inspection notes until the designs are approved

Coordinating with the supervising office, classified contractor, and insurance

Following the request until the permit is issued and handed to you

Related services the office provides

  • Land surveying
  • Regularizing an existing building
  • Renovation or demolition permits
  • Building completion certificates
  • Updating, merging & subdividing deeds
  • Renewing old permits

Step by Step

How It Works

01

Authorization

You authorize our office as the design office from your Balady account.

02

Design & Submission

We select the survey report, prepare the architectural and structural designs, and submit the request.

03

Technical Inspection

The request is auto-assigned to a technical inspection company that reviews it against the Saudi Building Code; we resolve any notes.

04

Municipality Approval

The municipality reviews the request and issues a design approval certificate.

05

Supervisor, Contractor & Insurance

The supervising office and contractor are contracted, and the contractor applies for the hidden-defects insurance policy.

06

Payment & Issuance

Once the permit and insurance fees are paid, the permit is issued electronically and utilities are notified.

Get Ready

Required Documents

  • An updated electronic deed from the Ministry of Justice, or a housing or investment contract
  • A survey decision for construction purposes
  • A soil study report
  • Design office contract, plus supervising office and contractor contracts
  • Hidden-defects insurance policy
  • A traffic study (if the activity requires it)

List per the Balady platform at the time of writing — we review it with you before starting, as it can be updated.

Specific to Makkah

What to Know Before You Start

Holy Capital Municipality & Balady

Building permit requests in Makkah are submitted electronically through Balady and reviewed by the Municipality before approval; after construction, the occupancy certificate is requested on the same platform.

Royal Commission for Makkah scope

The Royal Commission for Makkah City and Holy Sites has a direct geographic scope of about 2,774 km² covering the Haram and Holy Sites boundaries and historic and heritage areas, with its own planning guides. We check your plot's location before designing.

Near historic sites

The draft planning guide for historic areas includes controls on heights and facades to match the place's identity, so we account for them if your plot is near a historic site.

FAQ

Questions About This Service

Tamarah Engineering Consultations

Ready to Start Your Project?

Send us your plot and project details and we'll come back with a work plan and a fitting quote.

Or call the office directly:055 055 9210